Energy Code Compliance for Northern California
Residential & Low Rise Multi-Family
CEC Title 24 Trained
EPA 608 UNI
-
Pressurization test verifying total duct leakage and leakage to outside are within Title 24 limits. Poorly sealed ducts in a hot attic can cut cooling capacity by 20–30%.
-
Staged inspection verifying the air barrier and insulation meet every applicable QII requirement. Enclosed cavities are verified before cover; blown ceiling insulation is verified after ceiling drywall where used.
-
Field test confirming the AC system's refrigerant charge is within manufacturer spec. An overcharged or undercharged system loses efficiency and compressor life.
-
Room-by-room airflow measurements confirming the HVAC system delivers the design CFM to each conditioned space. Poor airflow means uneven temperatures and reduced efficiency.
-
Required when the Title 24 used a reduced infiltration credit. Tests whole-house air tightness. Many builders are unaware this test is required until the rater arrives.
-
Diagnostic procedure that measures how much conditioned air escapes from a building's duct system directly to the outdoors or unconditioned spaces
-
Confirms installed equipment brand, model, and rated efficiency match the CF-1R. A mismatch requires a Title 24 revision before the permit closes.